The Future Of
Community Living
Is EV Ready.
End-to-end EV charging for residential communities. One sanctioned load powers every bay — surveyed, installed, billed, and fully managed by Nevora. From grid to garage, we handle everything.
The EV tipping point
is already here.
DISCOMs size local transformers with a 0.5–0.6 diversity factor — the assumption that not everyone draws power at once. When 15–20 unmanaged EVs plug in at midnight, that assumption breaks. Individual charging is no longer viable at scale.
₹25–40 Lakh Upgrade Risk
Unmanaged simultaneous charging can force communities into emergency transformer upgrades costing ₹25–40 lakh — avoidable with centralised load management.
The Centralised Charging System
From survey to switched-on.
One partner, one accountable process — no coordinating vendors, electricians, and billing separately.
Site Survey
A free on-site assessment of your sanctioned load, parking layout, and electrical room — the engineering starting point.
Design & Proposal
We design the centralised backbone and return a clear proposal within 48 hours of the survey.
Installation
Our team installs the shared infrastructure and charge points, coordinating cabling and DISCOM approvals.
Managed Operation
CORE goes live — real-time load balancing, automated per-resident billing, and ongoing monitoring by Nevora.
Engineered For Your Building
Whether you're retrofitting an existing society or building from the ground up, there's a Nevora path for your community.